  • 18’’x 1 km Pipeline from Pan Ocean Oil Company (POOC), Ogharefe to the Escravos-Lagos-Pipeline (ELP) tied at KP 46.33.
  • 18’’x 1.2km Pipeline from ELP to the NIPP Ihovbor Pressure Reduction & Metering Station, (PRMS) tied in at KP 87.279.
  • 18’’x 610m pipeline from NIPP Ihovbor PRMS to NIPP Ihovbor Power Plant.
  • 16’’x 14km pipeline from Nigerian Petroleum Development Company, (NPDC), Oredo to the ELP tied at KP 51.3.
  • NIPP Ihovbor PRMS with a capacity of 120mmscufd.
Power Generation Projects

View details of the 10 Power Plants built across Nigeria