  •  18’’x12km pipeline from Addax-Izombe to NIPP Egbema PRMS
  • 18’’x 4km pipeline from SPDC/NPDC Egbema-East to NIPP Egbema PRMS
  • 18’’x 8km pipeline from SPDC/NPDC Egbema-West to NIPP Egbema PRMS
  • Egbema PRMS  with a capacity of 100mmscufd.
Power Generation Projects

View details of the 10 Power Plants built across Nigeria

You know, one of the great things about most renewable technologies – not every technology, but many of them – is the jobs have to be local. When you’re talking about a power plant and power generation using solar thermal technology, the jobs will be where the plant is.